Home › Safety and Health Management

SAFETY & HEALTH

Safety and Health Management

Check the risks before construction. We check all work in advance through risk assessment, from on-site construction to move-in and after-sales service, and manage it according to the construction company's safety standards.

Every yearRegular risk assessment
By sitePre-construction risk assessment
Every daySafety inspection meeting before work
10million+Accumulated construction experience

SAFETY & HEALTH POLICY

Safety and Health Management Policy


Does not start work that is not confirmed safe.

WellTech Co., Ltd. President Jo Guk-hee

  1. 01
    Risk Confirmation Before Work

    All construction and work confirm risks and countermeasures with workers before starting.

  2. 02
    Direct Participation of Workers

    On-site workers participate in the entire risk assessment process from identifying risk factors to establishing countermeasures.

  3. 03
    Confirmation Until Improvement is Completed

    Identified risk factors are confirmed with the responsible person and a deadline is set, until the improvement is completed.

  4. 04
    Complies with original blue safety standards

    Follows the safety rules, work permit, and safety education standards of the construction company, and immediately improves any identified issues.

RISK ASSESSMENT

Risk assessment operations

Conducts risk assessments in accordance with Article 36 of the Occupational Safety and Health Act, and shares and records the results with workers.

When is the assessment conducted?

Once a year

Regular assessment

Reviews the risk factors of all work and confirms whether existing measures are working properly.

When changes occur

Unscheduled assessment

Conducted when starting a new site, introducing new equipment or tools, changing work methods, or when an accident or near-miss occurs.

Every workday

Pre-Work Safety Meeting (TBM)

Before starting the work, all workers confirm the day's work content, risk factors, and countermeasures together.

How is it evaluated?

  1. 01Preparations

    Confirm the evaluation target work and on-site conditions, and determine the participating workers.

  2. 02Identification of hazardous and risky factors

    Find risk factors through on-site inspection, interviews with workers, and case studies of near-misses.

  3. 03Determination of risk level

    Judge the identified risk factors in three levels: high, medium, and low.

  4. 04Establishment and implementation of risk reduction measures

    Apply countermeasures in the order of elimination/replacement → equipment improvement → work procedures → protective equipment.

  5. 05Sharing and documentation

    Inform the worker of the results through TBM and education, and keep the records for more than 3 years.

Criteria for determining riskDetermine the order of actions based on the judgment result.
High
Immediate improvement

Stop the work until the improvement is completed.

Medium
Work after implementing countermeasures

Start the work after applying reduction measures.

Low
Maintain current level

Maintain current safety measures and check them regularly.

HAZARD CONTROL

Risk factors and countermeasures by construction tasks

Organize risk factors according to the installation sequence of the ceiling-mounted drying rack, and re-evaluate based on the conditions at each site.

Work stepsMajor risk factorsManagement measures
Material entry and transportationLower back injury, finger entrapment, tripping in passageways during heavy object transportationTwo people per team for transportation, use of transport carts and elevators, and clearing the entry passageways
Ceiling drilling and anchor fixationDrill dust and fragments, noise, electric shock from power toolsWear safety goggles and dust masks, use tools with residual current devices, and inspect tools before work
Ladder and scaffold work key managementFall, ladder slip · fallPrior use of step ladder · work platform, 2 people per team with lower support, secure chin strap of safety helmet
Main unit installation · power wiring key managementElectric shock, main unit fallConfirm power cut before wiring, use insulated tools, lift · fix main unit with 2 people per team
Trial operation · lifting testPinching · collision in descending areaControl access in descending area, check automatic stop function upon obstacle detection
Work cleanup · removalTripping on packaging materials · debris, fireImmediately clean · remove packaging materials · debris, finish after cleaning work area
After moving in, service visitElectric shock, fall, damage to living spaceTurn off power before work, use protective mats, comply with ladder safety rules

※ Since ceiling height, ceiling structure, and concurrent work vary by site, please prepare a separate risk assessment form for each site and submit it to the main contractor before starting work.

SAFETY ACTIVITIES

On-site Safety Activities

The risk assessment results are not just documents, but are followed up through daily site activities.

Safety inspection meeting before work
01 · TBMSafety inspection meeting before work

Before each work starts, all workers confirm the work content, risk factors, and countermeasures together.

Safety and health education
02 · EDUCATIONSafety and health education

New workers receive training and regular training to learn safety rules for each task and keep records.

Provision and Management of Protective Equipment
03 · PPEProvision and management of protective equipment

Provide protective equipment such as safety helmets, safety shoes, safety goggles, and gloves, and check if they are worn.

On-site safety inspection
04 · INSPECTIONOn-site safety inspection

Check the condition of tools, ladders, and scaffolding and the work area using an inspection checklist and record the results.

Sharing of near-miss accidents
05 · NEAR MISSSharing of near-miss accidents

Collect cases that could lead to injury and reflect them in risk assessments, and share them with other sites.

Participation in general contractor safety coordination
06 · COOPERATIONParticipation in general contractor safety coordination

Participate in safety education, coordination bodies, and joint inspections by construction companies, and immediately improve any identified issues.

DOCUMENTS

Submit safety documents of subcontractors
immediately

We have the necessary documents for subcontractor registration, safety and health level evaluation, and review before on-site deployment. If there is a requested format per site, we will complete it according to that format.

  • Safety and Health Management PolicyOriginal copy with the CEO's signature
  • Results of risk assessment implementationRegular, spot, and site-specific evaluation forms
  • Work plan and work procedure documentsCeiling drilling, high-altitude work, and power wiring
  • Records of safety and health education implementationNew Staff · Regular Training Log
  • TBM LogAttendees and Shared Contents of Pre-Work Safety Meeting
  • Protective Equipment Issuance LedgerIssued Items · Receiver Confirmation
  • Tool and Equipment Inspection SheetPower Tools · Ladders · Measuring Tape
  • Emergency Contact List · Emergency Measures PlanReport and Handling Procedure in Case of Accident

CONTACT

Supply to Construction Companies · Distributors · OEM Consultation

Once you inform us about the site size and schedule, a business department staff member will personally guide you from model selection to quotation.